The Base Case concept for the Frøy development consists of a Wellhead platform (WHP), comprising a light topside with process facilities, providing space for…
18-06-2014
The Shtokman offshore site is characterized by sea ice and glacial intrusions. The moored Flotating Production Unit (FPU) is designed to withstand severe ice…
16-06-2014
The Stena Don is a CS35 column stabilized floater delivered by Kværner Drill floor height 12 m Warnow Werft to Stena Drilling. The engineering…
The Phase II of the Sakhalin 2 gas and oil project is until now the largest single foreign investment project in Russia. Phase II…
15-06-2014
The Troll Gravity Base sub structure is 370 m high, the tallest platform support in the North Sea.