Gullfaks Platforms

Gullfaks B - Verification of Gullfaks B topsides structures during transportation to the mating site. Client: Moss Rosenberg Verft. Gullfaks C - The substructure for the GBS (gravity Base Structure) platform has a total height of 262 metres. 240.000 m3 of concrete and 80.000 tonnes of reinforcement steel were used. The substructure has a total deck load capacity of 49.000 tonnes.

Engineering services

Multiconsult had a central position during the detail engineering of the concrete substructure for the Gullfaks C platform.

Client: Norwegian Contractors.

In addition, Multiconsult participated in the following projects during the Gullfaks field development:

• Verification of Gullfaks B topsides structures
during transportation to the mating site.

Client: Moss Rosenberg Verft.

• Concept studies of the helideck for the
Gullfaks C platform.

Client: Norconsult Offshore Engineering.

Diciplines

• Geotechnics
• Structural steel
• Concrete Design
• Analyses