The platform design allows for eleven conductors to be installed. Completion of the wells will be performed by a jack up rig located next to the Frøy Wellhead platform, with the drilling rig skidded over to the WHP.
Engineering services
Multiconsult has performed third party verification of jacket, topside and skid base
structures.
The work covered independent structural analyses and review of documents produced in the detail engineering phase.
Disciplines
• geotechnics
• Structural steel